Indoor 3G Pitch Construction
Following their 2015/2016 Premier League promotion season MFC sought CLS Sports to carry out their indoor synthetic pitch refurbishment.
CLS removed the existing surface which had been down for over 20 years, before carrying out remedial works to the dynamic base.
Once the base was regraded using the CLS Laser Grader an insitu rubber shock pad was installed. The 3G synthetic turf was then laid and the associated sand and rubber infill added to ensure the correct characteristics for play were achieved.