MIDDLESBROUGH FOOTBALL CLUB

Indoor 3G Pitch Construction 

Following their 2015/2016 Premier League promotion season MFC sought CLS Sports to carry out their indoor synthetic pitch refurbishment. 

CLS removed the existing surface which had been down for over 20 years, before carrying out remedial works to the dynamic base.

Once the base was regraded using the CLS Laser Grader an insitu rubber shock pad was installed. The 3G synthetic turf was then laid and the associated sand and rubber infill added to ensure the correct characteristics for play were achieved.  

Key Facility Facts:

  • 1696m2
  • Removal of old 20-year-old synthetic surface
  • Insitu rubber shock pad installation
  • 3G synthetic turf installation
  • FIFA 2 Star surface