Kettlethorpe High School MUGA

Kettlethorpe High School

MUGA Refurbishment

After installing a full size 3G pitch for Kettlethorpe High School, CLS Sports were then appointed to refurbish the school’s existing MUGA, by resurfacing it with a new Macadam layer and repainting the surface.

Kettlethorpe High School MUGA Refurbishment

The existing surface was thoroughly cleaned and the man holes raised in preparation for the new Macadam layer. The perimeter of the existing surface was the planed off and the new Macadam layer installed.

Following this a water based polyurethane coloured coating was applied to the surface to provide a durable, high textured finish that is slip resistant.

The MUGA is a great addition to the schools facilities and is used for tennis, netball and basketball.

Scope of the works:

  • Installation of fencing
  • Installation of Macadam surfacing
  • Application of polyurethane coloured coating
  • New line markings
Previous Kettlethorpe High School MUGA
Kettlethorpe High School MUGA Refurb
Finished Kettlethorpe High School MUGA
Top